Brokered by OMNI Homes International

Last updated Nov 2026

What should a seller do when the BINSR arrives?

You have 5 days to respond, and you have more choices than "fix it or refuse." Since AAR's 2022 contract revision, a seller can correct or address each item on the BINSR (Buyer's Inspection Notice and Seller's Response). That can be a repair, a credit, a price change, or another concession. The buyer then has 5 days to accept your response or cancel.

Data as of AAR Residential Resale Purchase Contract Rev. 02/2026, AAR notes from 2022 and 2023, and October 2026 MLS figures.

Sources: AAR, Revised Purchase Contract and BINSR, Sep 20, 2022; AAR Residential Resale Purchase Contract, February 2026 sample.

The three clocks

Clock Length What starts it
Inspection period 10 calendar days (contract default) Contract acceptance. Holidays don't add days.
Seller response 5 days Delivery of the buyer's BINSR
Buyer decision 5 days Your response, or your response deadline if you don't respond

Sources: AAR, Holidays Do Not Extend the Inspection Period, Jan 2, 2023; Doug Palmer, Arizona BINSR and Inspection Period, Oct 28, 2026.

Not responding doesn't end the deal or make the BINSR go away. The buyer still gets 5 days after your deadline to accept or cancel. Silence is usually the weakest move you can make.

Your options on each item

AAR's 2022 revision lets a seller correct or address any disapproved item. In practice, you can respond item by item in these ways:

  1. Agree to correct it. You make the repair before close of escrow.
  2. Address it another way. Offer a credit, a price reduction, a longer close of escrow, months of HOA dues, or a rate buydown for the buyer.
  3. Decline it. You aren't required to fix anything. The buyer can then accept as is or cancel within their 5 days.

You can mix these: fix some items, credit others, and decline the rest. If a credit or concession needs its own paperwork, that's a separate signed agreement, not the BINSR itself.

Source: AAR, Sep 20, 2022.

Rules for repairs you agree to

  • Licensed contractor. Repairs of $1,000 or more, repairs that aren't minor, and repairs that need a permit must be done by a licensed contractor. Check a contractor's license at the Arizona Registrar of Contractors.
  • Receipts. Deliver paid receipts for agreed repairs to the buyer 3 days before COE, unless the contract sets another number (AAR Residential Resale Purchase Contract, Rev. 02/2026, Section 6j, "Buyer Disapproval"). The buyer's walkthrough confirms the work (Section 6l, "Walkthrough(s)").
  • Lender limits on credits. The buyer's lender has to approve any credit and may cap total seller credits. A credit the lender won't allow can cost you time you don't have.

Source: AAR, Sep 20, 2022; AAR Residential Resale Purchase Contract, Rev. 02/2026 sample (Sections 6j and 6l).

Why the BINSR matters more in this market

Buyers have more leverage than they did a year ago. In October 2026, Oro Valley had 4.3 months of supply, and homes closed at a median 95.24% of their original list price. In ZIP codes 85718 and 85750 (Catalina Foothills), supply was 4.9 months. A buyer who cancels during the inspection period has other homes to choose from.

Source: the MLS (Flexmls, MLSSAZ), single-family, October 2026.

What I would personally do

What I would personally do is get ahead of the BINSR before you list. Order a pre-listing inspection, fix the items that are safety issues or need a permit, and keep the receipts. When the BINSR arrives, I'd sort it into three groups:

  • Fix: safety and permit items, done by a licensed contractor.
  • Credit: big-ticket items the buyer wants to choose themselves, kept within the lender's cap.
  • Decline: cosmetic items, with a one-line reason.

Then I'd respond in 2 or 3 days, not 5. A fast, clear response keeps the buyer from looking at other homes.

Frequently asked questions

How long does a seller have to respond to a BINSR in Arizona?

5 days after the buyer delivers it, under the AAR Residential Resale Purchase Contract. The buyer then has 5 days to accept your response or cancel.

Does a seller have to make the repairs on a BINSR?

No. You can agree to correct an item, address it with a credit or other concession, or decline it. If you decline, the buyer can accept the home as is or cancel within 5 days.

Can I give a credit instead of doing repairs?

Yes. Since AAR's 2022 revision, a seller can address an item with a credit. The buyer's lender must allow it and may cap total credits. A credit that needs its own paperwork is a separate signed agreement.

What happens if I don't respond to the BINSR?

The buyer still gets 5 days after your response deadline to accept or cancel. Not responding doesn't stop the buyer from walking away.

Do repairs have to be done by a licensed contractor?

Yes, if the job is $1,000 or more, isn't minor, or needs a permit, per the AAR contract materials.

Do holidays extend the 10-day inspection period?

No. AAR's Jan 2, 2023 note says they're calendar days, and holidays don't extend them.

Request a preliminary CMA BINSR quiz

Oro Valley · Catalina Foothills · Tucson · The 10-day inspection period · Home value · Market insights · Sources on this site

This page is general information, not legal advice. Your contract controls. Last updated Nov 2026. Figures stay next to the date they were published.