What is in the PDF?
- The three BINSR clocks, and what starts each one
- What a seller can offer besides a repair, from AAR's 2022 revision
- When an agreed repair needs a licensed contractor
- What the SPDS and the 5-year insurance claims history add to the inspection period
- What I would personally do in the first 48 hours after acceptance
What would I personally do?
What I would personally do is book the general inspection within 48 hours of acceptance, so there is still time for a roofer, plumber or HVAC follow-up inside the 10 days. Then I would write the BINSR around the items that matter to the buyer's lender and budget, not every line of the report.
The 10-day inspection period and the BINSR · BINSR guide for sellers · How buying works

